Before work starts
Confirm the model numbers, assessed capacity, controls, equipment locations, duct or pipe allowances, drainage, electrical work, access, approvals and exclusions. Agree on removal of old equipment where required and clarify payment terms. Check that the relevant trades are appropriately licensed for the work; a refrigeration qualification does not itself establish every electrical or building permission.
At commissioning and handover
Ask the installer to explain operation, zone use, filter access, maintenance requirements and the manufacturer's warranty process. Retain the invoice and equipment documentation. Inspect the agreed installation scope and raise any concerns through the supplier's process. A checklist supplements the design and legal requirements; it is not a substitute for the manufacturer's commissioning procedure.
Further information from the relevant Australian public authority or licensing body. Equipment-specific requirements must be checked against the manufacturer's instructions and the actual property.