Confirm the builder's actual inclusion
Request the equipment model numbers, capacity, zones, controller, outlet allowance and electrical scope in writing. A provision for air conditioning is not the same as supplied and commissioned equipment. Check indoor-unit space, service clearance, condensate drainage and outdoor-unit positioning with the relevant trades before construction reaches a stage that restricts access.
Plan the handover
Ask who is responsible for commissioning, controller setup, filter access and manufacturer warranty documentation. Review the proposed zoning against the rooms you will occupy, not only the builder's standard package. An aftermarket quote should identify what construction provisions can be reused and what new work is required; it should not assume every new home has a suitable pre-installed duct layout.
Further information from the relevant Australian public authority or licensing body. Equipment-specific requirements must be checked against the manufacturer's instructions and the actual property.