What the installer needs to assess
Roof access, equipment removal, duct routes, outlet work, electrical connection, controls and commissioning affect the schedule. A two-storey design or constrained building can need additional work and coordination. Identify approvals, building alterations and access arrangements before confirming the booking rather than treating them as tasks discovered on installation day.
Agree on a realistic booking and handover
Ask for the expected duration, arrival arrangements, household access requirements and any disruption to electrical supply. Confirm who completes electrical or building tasks and whether multiple visits are required. Allow for testing and the operating handover, not just placing equipment. If an unexpected site condition changes the scope, request an explanation and agreement before additional work proceeds.
Further information from the relevant Australian public authority or licensing body. Equipment-specific requirements must be checked against the manufacturer's instructions and the actual property.